Builders Risk & Course of Construction
Cover for the period when a building is most exposed and least protected.
From groundbreaking to certificate of occupancy a project carries exposures no completed-structure policy answers — materials in transit, soft costs, delay in completion, and the existing structure on a renovation. The limit and the term have to match the schedule, not the loan.
Coverages We Recommend
What a course of construction programme should contain.
Builders risk is the most frequently misplaced policy in construction. A project gets insured on a generic form, and then something happens the form never contemplated.
The Foundation
Hard Costs
The structure under construction, plus materials and supplies, against physical loss during the build. Neither the owner's property policy nor the contractor's liability policy covers work in progress.
Special Form Coverage
Covers any peril not specifically excluded, rather than a named list. On a construction site, where losses arrive from unexpected directions, named-perils coverage leaves too much open.
Completed Value, No Coinsurance
Insure the full projected completed value from day one, at replacement cost. A reporting form or a coinsurance clause creates a penalty if the value is understated.
Soft Costs
This is where projects get hurt. A covered loss does not just destroy materials, it stops the clock. Soft costs respond to additional architect and engineering fees, permit and re-inspection fees, legal and accounting costs, additional loan interest, taxes and insurance during the extension. Frequently omitted, and often the largest uninsured piece of a construction loss.
Delay in Completion
The income you were counting on when the project was meant to deliver — lost rents on a multifamily building, lost sales revenue, extended carrying costs. A four-month delay on a forty-unit project is a substantial number.
Existing Structure
Essential on any renovation. Standard builders risk covers the new work. If a fire in the renovation damages the original building, the existing structure has to be specifically insured. This is the most common and most expensive gap in renovation projects.
Extensions That Matter
Debris Removal
Clearing a damaged site before you can rebuild is a major cost, and the standard sublimit is often far too low for a large structure.
Ordinance or Law
When you rebuild after a loss, you rebuild to today's code, not the code in force when you started. California's evolving seismic, energy and fire-hardening requirements make this essential rather than optional.
Property in Transit and Off-Site
Materials are exposed while being delivered, and while staged at a yard, a warehouse or a fabricator's shop. Base coverage usually ends at the site boundary.
Theft of Materials
Copper, wire, appliances, fixtures and lumber are stolen from California job sites constantly. Confirm the sublimit is realistic and understand the security conditions the carrier requires.
Temporary Structures
Scaffolding, falsework, shoring, fencing and site trailers are project assets. They are excluded or heavily sublimited on most base forms.
Testing & Startup
Commissioning HVAC, electrical and mechanical systems is its own exposure. Many forms exclude loss during testing unless it is added back.
Expediting Expense
Pays the premium to rush replacement materials or run overtime crews to hold the schedule after a loss. Often cheaper than the delay it prevents.
California Catastrophe
Earthquake
Standard builders risk forms exclude it. A partially completed structure — framed but not yet braced or sheathed — can be more vulnerable than a finished building. Lenders on California projects frequently require it.
Flood
Excluded on standard forms. Relevant for projects near waterways, in mapped flood zones, and in post-burn debris-flow areas.
Wildfire Exposure
Projects in or near high fire hazard severity zones face restricted appetite and higher deductibles. Underwriting is tight and submissions need to be well documented.
The Question Most People Cannot Answer
How Does Your Policy Treat Defective Work?
Every builders risk policy handles this differently, and the difference is enormous. The narrowest position excludes the defective work and any damage resulting from it. A broader one excludes only the cost to correct the defective part, and covers resulting damage to the rest of the project. If a defective weld causes a partial collapse, that distinction decides whether you are paid for the weld or for the collapse. Ask which one you have. Most people do not know.
Who Is Named on the Policy?
Owner, general contractor, subcontractors and lender all have an insurable interest. A party not properly named may have no standing at claim time. Lenders typically require mortgagee or loss payee status.
Does the Term Match the Real Schedule?
California projects slip. If the policy expires before substantial completion, coverage stops. Build in a realistic term and agree how extensions are handled before you need one — an extension requested by a project already running late gets scrutinised.
What Happens at the Handover?
The most dangerous moment in a project's insurance life is the gap between builders risk ending and permanent property coverage starting. Builders risk typically terminates at occupancy, acceptance or first use, whichever comes first.